Most popular
Usually leave our warehouse within 5-7 business days

Farbon Short Wall Light White - FARBON WBS-WH

SKU316765
RRP: AU$97.75  
AU$84.95
(You save: AU$12.80 from RRP)
Enquire Now
Description
The Farbon series provides great task or decorative lighting to all your favourite areas!

This fun & versatile range features adjustable heads to create directional lighting where needed, and takes standard E27 globes.

Farbon desk, wall, pendant and floor lamps are also available in a wide variety of colours and finishes to suit your home or office.

The Farbon wall lamp is a great portrait of mid-century modernist style. The subtle curves and clean lines reflect the informal hip and trendy classic style.

Presented in black or white with a brass matt flexi-arm for the control of directional light.

A bespoke on-off switch on the base for your convenience.

Specifications
- Input Voltage: 240V
- Number of Globes: 1
- Lamp Base: E27/ES Edison Screw
- Energy efficient: Energy saving LED ready
- Globe(s) are not included

Dimensions
- Height: 150mm
- Projection: 370mm
- Backplate Diameter: 100mm

Click to view technical specification: